Check and adjust the cooling tower before starting
1、Remove the wind and cover, adjust the top wire, and adjust the elastic band.
2、Check whether the motor and reducer of the cooling tower transmission system are operating normally.
3、Check the water tray of the cooling tower, the fillet of the filter, check the water tray, the close of the foot, adjust the float position, and make the water table meet the requirements of use.
4、Adjust fan blade Angle, measure motor current, make it reach the optimum working condition standard.
5、Adjust the cooling tower inlet and outlet valve to make the cooling tower water flow meet the requirements. The requirements are available and the machine is turned on.
三、Inspection of cooling tower operation
1、Regularly inspect the cooling tower in the running, ask the user's opinion, understand the use of the cooling tower.
2、Test the cooling tower water temperature of inlet and outlet, motor running current and other technical data.
3、Check the operating condition of motor and reducer etc. Check the actual working conditions of the water system.
4、Deal with faults immediately.